Home
Conservatories, Edwardian, Victorian, Gable & Lean To, P Shape, Bespoke, Glass Roofs, BayBee Compact Conservatories, Uni Blinds, Coloured Finishes, Pilkington Glass, Obscure Glass, Decorative Glass, Conservatory Structure
Windows & Doors, Windows, Doors, Sash Windows, Folding Doors, Uni Blinds, Obscure Glass, Decorative Glass, Pilkington Glass
Loft Conversions
About Us, Special Offers, Useful Links
Clients
Site Map
Contact Us

Edwardian

Victorian

Gable &
Lean To

P Shape

Bespoke

Glass Roofs

Bay-Bee
Compact Conservatory

7 Day Build Conservatory with Dynabase

Repairs & Supply Only

Uni-Blinds

Coloured Finishes

Pilkington
Selfclean Glass

Obscure Glass

Decorative Glass

Conservatory
Structure in Detail

Have a New Conservatory Built in Just 7 Days*

Dynamic Conservatories can build you a brand new conservatory in just 7 days utilising a new revolutionary modular conservatory system and Dynabase steel base system. Most conservatories can take anything upto a month to complete. The various stages from the initial excavation, backfilling with tonnes of aggregate, concrete mixing, laying and setting, bricklaying and finally erecting the conservatory itself are all time consuming, and cause no end of disruption to the house hold.

Now, thanks to Dyanmics new modular system, incorporating a unique rigid steel base with a moisture-proof wooden floor, it is possible to build a strong and solid fully insulated conservatory, guaranteed for 10 years, which is indistinguishable from a tradional one, in 7 days - a fraction of the time you would normally expect.

Advantages of This Amazing New 7 Day Build Conservatory System

  • Highest possible quality, accepted by Architects, Planners & discerning customers
  • Totally indistiguishable from a conventional build
  • Manufactured to exact sizes, so conservatory will always fit
  • Site disruption reduced to a minimum
  • Can be carried through house when no rear access available
  • No skips needed to remove spoil, as no major earthworks are required
  • No need for tonnes of aggregate for backfilling
  • No need for large scale cement mixing or building work
  • Ideal where site access is difficult, uneven or sloping
  • No need to move manholes or drains
  • Can be installed all year round
  • Can be fitted over existing patios (no need to dig up tons of concrete)
  • Moisture resistant wooden floor means no waiting for concrete to cure
  • Dozens of brick finishes, plus render and pebbledash options
  • Integral insulation ensures warm in winter and cool in summer
  • Conforms to building regulations and designed to BSI Standards

* Subject to site suitability, weather and availability.

DAY 1
Day 2
Day 3/4

day 1Because of its unique steel frame, the Dynabase System requires a minimal amount of digging. All that is required is a series of small concrete pads.

No need for large scale excavations, soil removal, cement mixing and tonnes of aggregate to back fill. Also the lack of disruption to the garden is a great selling point to your customer.

day 2The Dynabase frame is assembled, levelled and bolted to the exterior wall. The modular walls are then bonded and bolted to the frame (not required if glass is going to be full height).

These walls come in various real clay brick, stone or rendered finishes to match the existing house. By the end of day 2 we are ready to start the conservatory!

day 3/4The conservatory windows, doors and roof are fitted as in a conventional installation.

Electrics and central heating pipes can be easily concealed within the specially designed wall cavity in the modular wall base system.

DAY 5
DAY 6
Day 7 COMPLETED

day 5Under floor insulation and floor is now fitted. The suspended floor is ideal for under floor heating.

Walls are fitted with additional insulation if required and the internal wall panels are fitted.

day 5The bridging tiles are bonded in place ready for pointing the next day.

day 6The final trim is fixed to the conservatory and bridging tiled pointed with the supplied cement mix ensuring a perfect colour match to the rest of the wall.

Surrounding ground is made good (soil, patio, crazy paving etc).

 

victorian conservatory

Final clean up and the conservatory is finished and ready for use.

Don't wait any longer call Dynamic Now on 01793 727297

Conservatories Swindon - Windows Swindon - uPVC Swindon - Doors Swindon - Soffits Swindon - Double Glazing Swindon
Telephone: 01793 727297 or 07768 774274
info@dy-namic.co.uk
© www.dy-namic.co.uk 2007
Fascias Swindon - Aluminium Swindon - Hardwood Swindon - Loft Coversions Swindon - Conservatory Repairs Swindon

Website design and build by Pastiche Web Studio